Project: wcooper   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

May 04, 2020     Elevator Attachment       Category: Empennage
Worked on attaching the elevators. Filed down a bushing in the drill press, to be used as a drill guide. I used an Allen Wrench to help align the rod end bearings during installation. Lot's of on and off to adjust the elevators to the correct gap on the edge. I finally found Temporary Assembly Pins at Aircraft Spruce. The pins are threaded so the pin holder can be removed — this is necessary to prevent damage to the skin when you move the control surface too far during fitting.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.